The project consists of the development of additional data centre space at the IBM site at 3600 Steeles Avenue East, Markham, Ontario, Canada. The space and infrastructure was developed in a modular arrangement. The first module was delivered on a fast track basis, with an early completion successfully achieved; the second module was delivered and integrated seamlessly with the first module systems. The requested power and cooling density is 100 watts/sq. ft., the project was built, commissioned and tested to conform to a reliability level of 3+ as required by IBM best practices.